Ghana has commenced a $98.4 million port expansion project at Takoradi Port as the government moves to strengthen maritime infrastructure, improve cargo-handling capacity and support the country’s growing mining and manufacturing industries.
The project, known as Berth 19, is expected to address existing capacity limitations at the port and improve the movement of mineral exports and imported industrial materials.
President John Dramani Mahama officially broke ground for the project on November 10, 2026, during a ceremony at Takoradi Port in Ghana’s Western Region.
According to the Ghana News Agency, the Berth 19 development is valued at approximately $98.41 million and will involve the construction of a 300-metre-long berth designed to accommodate vessels with a capacity of up to 75,000 deadweight tonnes.
The project is expected to take 26 months to complete and is being financed through the resources of the Ghana Ports and Harbours Authority.
Takoradi Port plays an important role in Ghana’s international trade, particularly in the movement of minerals, industrial materials and other bulk cargo.
The facility has developed from its historical role as an export centre for commodities such as timber, cocoa, bauxite and manganese into a major maritime hub serving several sectors of the Ghanaian economy.
It currently supports container operations, offshore oil and gas activities, mineral exports and the importation of industrial materials.
However, increasing cargo volumes have placed pressure on some existing facilities, particularly the dry bulk terminal.
The government explained that the existing terminal was facing capacity constraints, making the expansion necessary to accommodate the growing movement of mineral ores and imported dry bulk products.
Mineral exports remain an important contributor to Ghana’s economy, while industries such as cement manufacturing depend on the reliable importation of raw materials.
One of the products handled at the port is clinker, an important material used in cement production.
The expansion is therefore expected to benefit both the mining and manufacturing industries by improving the capacity of the port to receive and transport industrial materials.
President Mahama stated that expanding the port was necessary to support Ghana’s changing economic needs and strengthen its ability to handle increasing trade volumes.
He also highlighted improvements already undertaken at the port, including dredging works that increased its depth to 16 metres.
The increased depth is expected to allow larger vessels to access the facility, improving its capacity to accommodate growing maritime traffic.
The Berth 19 project forms part of wider infrastructure investments aimed at improving Ghana’s transportation and logistics systems.
Another major development announced during the groundbreaking ceremony was Project Shiprite, a $137 million ship repair and maintenance facility being developed within Takoradi Port by Prime Meridian Docks Ghana Limited.
The project is being undertaken through a 25-year concession arrangement and is expected to strengthen Ghana’s capacity to provide ship repair and maintenance services to vessels operating along the West African coast.
According to the Ghana News Agency, the ship repair facility is expected to create approximately 430 jobs when operational, with 30 per cent of the jobs reserved for women.
The project is expected to be completed within 18 months, while Berth 19 has a projected construction period of 26 months.
These developments are expected to improve Takoradi’s position as an important maritime and industrial centre in the region.
The government has also linked port development to broader investments in road and railway infrastructure.
The proposed Western Railway Line is expected to complement improvements at Takoradi Port by supporting the movement of goods from mining and industrial centres to the port.
Better railway connections could reduce transportation pressure on roads and improve the efficiency of cargo movement.
For Ghana, the expansion of Takoradi Port is an important part of its efforts to strengthen trade infrastructure, attract investment and support economic diversification.
The project could also create opportunities for shipping companies, logistics operators, construction firms and businesses involved in mining and manufacturing.
However, the success of the investment will depend on timely project delivery, effective management and the ability of the new facilities to attract additional cargo volumes.
As construction progresses, attention will focus on whether the expansion delivers the expected improvements in port capacity, employment and maritime competitiveness.
The Berth 19 project represents a significant investment in Ghana’s maritime future and could strengthen the country’s position as a major shipping and logistics destination in West Africa.













